Building Type: Hotel

Units: 238

Floors: 10

Scope of Work: Remove existing system and replace with re-engineered unit.

Before
3 - 7.5 HP units
1 unit running 24/7

After
2 - 7.5 HP units
Lag/Lead Variable Speed

Annual Cost Savings
Electricity: $2,600
Maintenance: $1,000

BACK TO CASE STUDY MENU
Case Study 3

123 North Orchard St
Suite 1B
Ormond Beach, FL 32174

866-325-8227 toll free
386-673-2293 fax

reply@lucasnow.com